Projects Under Review

Projects Under Review

Print
Press Enter to show all options, press Tab go to next option

Cargill Plummer Slough Bridge Project 

Installation of a 24-foot wide by 60-foot long concrete bridge across Plummer Slough

 Documents:

     Notice of Intent

     Draft Initial Study and Proposed Mitigated Negative Declaration

     Appendices

Public review period:

  June 12, 2018 - July 12, 2018

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer